Major Bridge A/C River Mahisagar

Project Client : Panchayat (R.& B.)Sub Division,Savli
Project Location : Savli, Vadodara
Project Cost : Rs. 19.95 cr.
Project Duration : 08/2015 to 06/2018
Project Status : Completed

Project Description

The bridge across Perennial River involved RCC pile foundation of 1500 mm dia and open foundation in Hard Rock, PSC Box girder of 40 m span in superstructure height of the pier about 21 m from river bed level etc. Design mix concrete for the project is done using computerized concrete batching plant, transit mixers and concrete pump.

Location