Nagaur Phatak Railway Over Bridge

Project Client : PWD Division, Didwana
Project Location : Nagaur, Rajasthan
Project Cost : Rs 4773.57 Lakhs
Project Duration : 11/2015 to 09/2018
Project Status : Completed

Project Description

RCC pile Foundations, RCC substructure, Precast RCC Girder in Superstructure, RE Wall in Approaches and Service Roads, and 90m long Railway under bridge of Twin Box for Four Lane Mega Highway, done by cut & cover method. We have carried out the Pile foundations with the Hydraulic Piling Rig Design. Mix concrete for the project is done using concrete batching plant, transit mixtures and concrete pump asphalt work is carried out using batch mix plant and sensor pavers railway portion work of the ROB involved composite steel four girder systsm(RDSO) superstructure of 36m span which is fabricated within a period of less than 6 months.