Ladnun Phatak Railway Over Bridge

Project Client : PWD Division, Didwana
Project Location : Nagaur, Rajasthan
Project Cost : Rs.2862.52 Lakh
Project Duration : 11/2015 to 08/2018
Project Status : Completed

Project Description

The work involved RCC pile foundations , RCC Substrcutre. Precast RCC girder in superstructure. RE Wall in approaches of height 11m and length 750m. Service roads and 90m long railway under bridge of Twin box for four lane mega highway done by cut & cover method. We have carried out pile Foundations with the Hydraulic piling Rig Design Mix Concrete for the project is done using Concrete Batching plant, transit Mixtures and concrete pump Asphalt work is carried out using Batch Mix Plant and Sensor pavers. Railway portion work of the ROB involved Composite Steel Four Girder System(RDSO) Superstructure of 36 m span,which is fabricated, launched by neavy machinery during traffic block and completed within a period of less than 6 (Six) Months